Matching Items (9)
Filtering by

Clear all filters

151681-Thumbnail Image.png
Description
Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to

Using experience, observations, data, current research, and writings in the field of volunteer management, it was determined there was a need to study the effects of leadership/management practices on the productivity outcomes of a volunteer construction workforce. A simple wood bench that would be tiled and painted was designed to test the areas of Time, Waste, Quality, Safety, and Satisfaction of different volunteer groups. The challenge was bolstered by giving the teams no power tools and limited available resources. A simple design of experiment model was used to test highs and lows in the three management techniques of Instruction, Help, and Encouragement. Each scenario was tested multiple times. Data was collected, normalized and analyzed using statistical analysis software. A few significant findings were discovered. The first; the research showed that there was no significant correlation between the management practices of the leader and the satisfaction of the volunteers. The second; the research also showed when further analyzed into specific realistic scenarios that the organizations would be better to focus on high amounts of Help and Encouragement in order to maximize the productivity of their volunteer construction workforce. This is significant as it allows NPO's and governments to focus their attention where best suited to produce results. The results were shared and the study was further validated as "significant" by conducting interviews with experts in the construction nonprofit sector.
ContributorsPrigge, Diedrich (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2013
150085-Thumbnail Image.png
Description
The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning

The wood-framing trade has not sufficiently been investigated to understand the work task sequencing and coordination among crew members. A new mental framework for a performing crew was developed and tested through four case studies. This framework ensured similar team performance as the one provided by task micro-scheduling in planning software. It also allowed evaluation of the effect of individual coordination within the crew on the crew's productivity. Using design information, a list of micro-activities/tasks and their predecessors was automatically generated for each piece of lumber in the four wood frames. The task precedence was generated by applying elementary geometrical and technological reasoning to each frame. Then, the duration of each task was determined based on observations from videotaped activities. Primavera's (P6) resource leveling rules were used to calculate the sequencing of tasks and the minimum duration of the whole activity for various crew sizes. The results showed quick convergence towards the minimum production time and allowed to use information from Building Information Models (BIM) to automatically establish the optimal crew sizes for frames. Late Start (LS) leveling priority rule gave the shortest duration in every case. However, the logic of LS tasks rule is too complex to be conveyed to the framing crew. Therefore, the new mental framework of a well performing framer was developed and tested to ensure high coordination. This mental framework, based on five simple rules, can be easily taught to the crew and ensures a crew productivity congruent with the one provided by the LS logic. The case studies indicate that once the worst framer in the crew surpasses the limit of 11% deviation from applying the said five rules, every additional percent of deviation reduces the productivity of the whole crew by about 4%.
ContributorsMaghiar, Marcel M (Author) / Wiezel, Avi (Thesis advisor) / Mitropoulos, Panagiotis (Committee member) / Cooke, Nancy J. (Committee member) / Arizona State University (Publisher)
Created2011
151243-Thumbnail Image.png
Description
The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was

The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was to create an understanding of high reliability construction work systems based on lessons from the production practices of high performance work crews. High performance work crews are defined as the work crews that constantly reach and maintain a high level of productivity and exceptional safety record while delivering high quality of work. This study was conceptualized on findings from High Reliability Organizations and with a primary focus on lean construction, human factors, safety, and error management. Toward the research objective, this dissertation answered two major questions. First, it explored the task factors and project attributes that shape and increase workers' task demands and consequently affect workers' safety, production, and quality performance. Second, it explored and investigated the production practices of construction field supervisors (foremen) to understand how successful supervisors regulate task and project demands to create a highly reliable work process. Employing case study methodology, this study explored and analyzed the work practices of six work crews and crew supervisors in different trades including concrete, masonry, and hot asphalt roofing construction. The case studies included one exceptional and one average performing crew from each trade. Four major factors were considered in the selection of exceptional crew supervisors: (1) safety performance, (2) production performance, (3) quality performance, and (4) the level of project difficulty they supervised. The data collection was carried out in three phases including: (1) interview with field supervisors to understand their production practices, (2) survey and interview with workers to understand their perception and to identify the major sources of task demands, and (3) several close field observations. Each trade's specific findings including task demands, project attributes, and production practices used by crew supervisors are presented in a separate chapter. At the end the production practices that converged to create high reliability work systems are summarized and presented in nine major categories.
ContributorsMemarian, Babak (Author) / Bashford, Howard (Thesis advisor) / Boren, Rebecca (Committee member) / Wiezel, Avi (Committee member) / Arizona State University (Publisher)
Created2012
157437-Thumbnail Image.png
Description
The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the

The success or failure of projects is not determined only by procedures, tasks, and technologies, but also by the project team and its effectiveness. In order to lead project teams towards successful outcomes, project managers must maintain high quality relationships in the workplace. When looking at employees’ relationships in the workplace, Social Exchange Theory introduces two types of exchanges: employee-organization and leader-member exchanges. While both types of exchanges focus exclusively on the employee’s longitudinal relationships, the interpersonal relationships among the team members are usually overlooked.

This research presents the results of a quantitative study of the interpersonal relationships of 327 project managers and assistant project managers in their workplace. Specifically, the study investigates if the quality of the relationship with particular stakeholders, such as one’s immediate supervisor (boss), peers, or subordinates, drives the individual’s quality of the relationship with other stakeholders.

Contrary to the expectations, in strictly hierarchical organizations (one direct supervisor), there is no significant correlation between the quality of relationships with the boss and the overall quality of the individual’s relationships. However, in the case of matrix organizations (two or three bosses), there are significant correlations between several variables such as the quality of the relationship, perceived importance and the time spent with each stakeholder, as well the inclination of the participant towards leadership actions. The driving relationship in matrix organizations is the one with “the most important peer”.
ContributorsK. Jamali, M. Hossein (Author) / Wiezel, Avi (Thesis advisor) / Sullivan, Kenneth T. (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2019
133942-Thumbnail Image.png
Description
Youth club sport has become a dominant part of society and the forefront of many childhoods. Youth sport participation holds various physical, psychological, and social benefits for children but as this industry continues to expand, when poorly managed, sport participation can become detrimental (Meân, 2013, p. 339). In this study

Youth club sport has become a dominant part of society and the forefront of many childhoods. Youth sport participation holds various physical, psychological, and social benefits for children but as this industry continues to expand, when poorly managed, sport participation can become detrimental (Meân, 2013, p. 339). In this study the experiences and perceptions of female youth club volleyball players (ages 15-17) were explored through semi-structured interviews with a particular focus on key areas of concern identified in the research literature: early specialization, overuse injury, and burnout (Hedstrom & Gould, 2004, p. 4, 15-37). A thematic analysis was used to explore these a priori themes alongside emergent themes that were identified: early motivation and perception, current motivation and perception, pressure and athletic scholarships, perception of high school volleyball, and schedules. The positive perceptions arising from the themes were addressed as a foundation to improve on the negative perceptions. Recommendations to reduce the pressure and stress associated with winning are made, in addition to proposals regarding the schedule of club volleyball in an effort to provide athletes with adequate rest period in order to reduce risks of burnout and overuse injury.
Keywords: youth sport, specialization, overuse injury, burnout, club volleyball.
ContributorsLifgren, Taylor Nicole (Author) / Mean, Lindsey (Thesis director) / Cayetano, Catalina (Committee member) / School of Social and Behavioral Sciences (Contributor) / Barrett, The Honors College (Contributor)
Created2018-05
154291-Thumbnail Image.png
Description
ABSTRACT

The objective of this dissertation is to identify a recommended balance between

leadership and management activities of a project manager who aims to rehabilitate a distressed construction project.

The data for this research was collected from 338 construction project professionals belonging to fifteen large construction companies who participated in leadership seminars originated

ABSTRACT

The objective of this dissertation is to identify a recommended balance between

leadership and management activities of a project manager who aims to rehabilitate a distressed construction project.

The data for this research was collected from 338 construction project professionals belonging to fifteen large construction companies who participated in leadership seminars originated by professors from Arizona State University. The seminars contained various leadership games and exercises that were designed specifically to collect data about leadership and management actions taken by the project managers.

The data from one of the games, called “Project from Hell” (PFH), was used in this research. The PFH game presents the participants with a set of fifty-two actions cards written on a deck of game cards and asks them to select the ten action cards they perceive as being most effective for turning a troubled construction project around. Each suit of the deck represents a different category of actions, focusing on either Traditional Leadership (Hearts), Best Value Leadership (Diamonds), Traditional Management (Spades), or Micro- Management (Clubs).

Statistical analysis of the results revealed that only sixteen of the fifty-two actions cards were selected with statistically significant consistency. Of these sixteen actions, six actions were form Traditional Management actions, five were Traditional Leadership actions, and five were Best Value Leadership actions. This rendered a recommended balance of 62% leadership activities vs. 38% management activities for project managers to rehabilitate distressed construction projects. It was also found that the same balance is recommended for the normal condition construction projects. The calculated weighted

i

scores for ranking the sixteen effective leadership and management actions revealed that the five Traditional Management actions are the top-most effective actions. This demonstrates the importance of stand still management actions in rehabilitating in trouble construction projects

The findings were converted into easy to implement guidelines about how project managers can change habits to increase their effectiveness by focusing on the right type of actions.

A generalization of the methodology for interpreting the results of any study based on selection of activities, was also developed.
ContributorsBehzad, Navid (Author) / Wiezel, Avi (Thesis advisor) / Gibson, Jr., G. Edward (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2016
155470-Thumbnail Image.png
Description
The workforce demographics in the United States are rapidly changing. According to census information, 35% of working adults are project to retire within the next 20 years. The construction is being particularly affected by this demographic shift as fewer employees are entering into the industry. This shift is especially bad

The workforce demographics in the United States are rapidly changing. According to census information, 35% of working adults are project to retire within the next 20 years. The construction is being particularly affected by this demographic shift as fewer employees are entering into the industry. This shift is especially bad among project professionals within the industry. The response to these changing demographics depends on how companies manage their talent and plan for successions. In order to investigate this workforce problem in the construction industry, the author has partnered with an expert panel of human resource executives from various companies in the construction industry. This research seeks to investigate methods in which construction companies can identify high potential project leaders early on in their careers through quantitative methodologies. The author first validated the research problem by gathering demographic data from six U.S. construction companies varying in size and industry expertise. As a result of analyzing information from 2,294 construction employees in the project management career path, the authors have found that 58% of these individuals are projected to retire within the next 12 years. The author also conducted a detailed literature review and six company interviews to investigate current succession planning practices in the industry. The results show that very few companies have contingency plans for early to mid-level employees. Lastly, the author conducted 76 employee psychological evaluations to measure personality and behavior traits. These traits were then compared to supervisory performance reviews of these employees. The results of this comparison suggest that high potential employees tend to showcase previous leadership experience and also tend to be more outspoken and are also able to separate their emotional bias from business decisions. Using these findings, the author provides an interview tool that employers can use to expand their talent pool in order to identify high potential candidates that may have been previously overlooked. The author recommends additional research in further developing the use of quantitative tools to evaluate early-career employees in order to more efficiently align resources within the shrinking talent pool.
ContributorsGunnoe, Jake Alan (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Thesis advisor) / Kashiwagi, Dean T. (Committee member) / Arizona State University (Publisher)
Created2017
149584-Thumbnail Image.png
Description
Construction work is ergonomically hazardous, as it requires numerous awkward postures, heavy lifting and other forceful exertions. Prolonged repetition and overexertion have a cumulative effect on workers often resulting in work related musculoskeletal disorders (WMSDs). The United States spends approximately $850 billion a year on WMSDs. Mechanical

Construction work is ergonomically hazardous, as it requires numerous awkward postures, heavy lifting and other forceful exertions. Prolonged repetition and overexertion have a cumulative effect on workers often resulting in work related musculoskeletal disorders (WMSDs). The United States spends approximately $850 billion a year on WMSDs. Mechanical installation workers experience serious overexertion injuries at rates exceeding the national average for all industries and all construction workers, and second only to laborers. The main contributing factors of WMSDs are ergonomic loads and extreme stresses due to incorrect postures. The motivation for this study is to reduce the WMSDs among mechanical system (HVAC system) installation workers. To achieve this goal, it is critical to reduce the ergonomic loads and extreme postures of these installers. This study has the following specific aims: (1) To measure the ergonomic loads on specific body regions (shoulders, back, neck, and legs) for different HVAC installation activities; and (2) To investigate how different activity parameters (material characteristics, equipment, workers, etc.) affect the severity and duration of ergonomic demands. The study focuses on the following activities: (1) layout, (2) ground assembly of ductwork, and (3) installation of duct and equipment at ceiling height using different methods. The researcher observed and analyzed 15 HVAC installation activities among three Arizona mechanical contractors. Ergonomic analysis of the activities using a postural guide developed from RULA and REBA methods was performed. The simultaneous analysis of the production tasks and the ergonomic loads identified the tasks with the highest postural loads for different body regions and the influence of the different work variables on extreme body postures. Based on this analysis the results support recommendations to mitigate long duration activities and exposure to extreme postures. These recommendations can potentially reduce risk, improve productivity and lower injury costs in the long term.
ContributorsHussain, Sanaa Fatima (Author) / Mitropoulos, Panagiotis (Thesis advisor) / Wiezel, Avi (Committee member) / Guarascio-Howard, Linda (Committee member) / Arizona State University (Publisher)
Created2011
153973-Thumbnail Image.png
Description
The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that

The workforce demographics are changing as a large portion of the population is approaching retirement and thus leaving vacancies in the construction industry. Succession planning is an aspect of talent management which aims to mitigate instability faced by a company when a new successor fills a vacancy. Research shows that in addition to a diminishing pool of available talent, the industry does not have widespread, empirically tested and implemented models that lead to effective successions. The objective of this research was to create a baseline profile for succession planning in the construction industry by identifying currently implemented best practices. The author interviewed six companies of varying sizes and demographics within the construction industry and compared their succession planning methodologies to identify any common challenges and practices. Little consensus between the companies was found. The results of the interviews were then compared to current research literature, but even here, little consensus was found. In addition, companies lacked quantitative performance metrics demonstrating the effectiveness, or ineffectiveness, of their current succession planning methodologies. The authors recommended that additional research is carried out to focus on empirical evidence and measurement of industry practices surrounding talent identification, development, and transition leading to succession.
ContributorsGunnoe, Jake A (Author) / Sullivan, Kenneth (Thesis advisor) / Wiezel, Avi (Committee member) / Kashiwagi, Dean (Committee member) / Arizona State University (Publisher)
Created2015