Matching Items (6)
Filtering by

Clear all filters

149708-Thumbnail Image.png
Description
Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a

Semiconductor manufacturing facilities are very complex and capital intensive in nature. During the lifecycle of these facilities various disciplines come together, generate and use a tremendous amount of building and process information to support various decisions that enable them to successfully design, build and sustain these advanced facilities. However, a majority of the information generated and processes taking place are neither integrated nor interoperable and result in a high degree of redundancy. The objective of this thesis is to build an interoperable Building Information Model (BIM) for the Base-Build and Tool Installation in a semiconductor manufacturing facility. It examines existing processes and data exchange standards available to facilitate the implementation of BIM and provides a framework for the development of processes and standards that can help in building an intelligent information model for a semiconductor manufacturing facility. To understand the nature of the flow of information between the various stakeholders the flow of information between the facility designer, process tool manufacturer and tool layout designer is examined. An information model for the base build and process tool is built and the industry standards SEMI E6 and SEMI E51 are used as a basis to model the information. It is found that applications used to create information models support interoperable industry standard formats such as the Industry Foundation Classes (IFC) and ISO 15926 in a limited manner. A gap analysis has revealed that interoperability standards applicable to the semiconductor manufacturing industry such as the IFC and ISO15926 need to be expanded to support information transfers unique to the industry. Information modeling for a semiconductor manufacturing facility is unique in that it is a process model (Process Tool Information Model) within a building model (Building Information Model), each of them supported more robustly by different interoperability standards. Applications support interoperability data standards specific to the domain or industry they serve but information transfers need to occur between the various domains. To facilitate flow of information between the different domains it is recommended that a mapping of the industry standards be undertaken and translators between them be developed for business use.
ContributorsPindukuri, Shruthi (Author) / Chasey, Allan D (Thesis advisor) / Wiezel, Avi (Committee member) / Mamlouk, Michael (Committee member) / Arizona State University (Publisher)
Created2011
156897-Thumbnail Image.png
Description
The water and wastewater industry in the United States is in dire need of renovation due to dwindling infrastructure and requires substantial reinvestment. Design-bid-build (DBB) is the traditional method of project delivery most widely applied in this industry. However, alternative project delivery methods (APDM) are on the rise and touting

The water and wastewater industry in the United States is in dire need of renovation due to dwindling infrastructure and requires substantial reinvestment. Design-bid-build (DBB) is the traditional method of project delivery most widely applied in this industry. However, alternative project delivery methods (APDM) are on the rise and touting the benefits of reduced project schedule and cost. The main purpose of this study is to conduct a qualitative and quantitative performance evaluation to assess the current impact of APDM in the water and wastewater industry. A national survey was conducted targeting completed water and wastewater treatment plant projects. Responses were obtained from 75 utilities and constructors that either completed their projects using DBB, construction manager at risk (CMAR), or design-build (DB). Data analysis revealed that CMAR and DB statistically outperformed DBB in terms of project speed and intensity. Performance metrics such as cost growth, schedule growth, unit cost, factors influencing project delivery method selection, scope changes, warranty and latent defects, and several others are also evaluated. The main contribution of this study was that it was able to show that for the same project cost, water and wastewater treatment plants could be delivered under a faster schedule and with higher quality through the utilization of APDM.
ContributorsFeghaly, Jeffrey (Author) / El Asmar, Mounir (Thesis advisor) / Ariaratnam, Samuel (Thesis advisor) / Bearup, Wylie (Committee member) / Arizona State University (Publisher)
Created2018
155142-Thumbnail Image.png
Description
ABSTRACT

This study examines the methodology for converting protected, permissive, and protected/permissive left-turn operation to flashing yellow arrow left-turn operation. This study addresses construction-related considerations, including negative offsets, lateral traffic signal head position, left-turn accident rates, crash modification factors and crash reductions factors. A total of 85 intersections in Glendale, Arizona

ABSTRACT

This study examines the methodology for converting protected, permissive, and protected/permissive left-turn operation to flashing yellow arrow left-turn operation. This study addresses construction-related considerations, including negative offsets, lateral traffic signal head position, left-turn accident rates, crash modification factors and crash reductions factors. A total of 85 intersections in Glendale, Arizona were chosen for this study. These intersections included 45 “arterial to arterial” intersections (a major road intersecting with a major road) and 40 “arterial to collector” intersections (a major road intersecting with a minor road).

This thesis is a clinical study of the field conversion to flashing yellow arrow traffic signals and is not a study of the merits of flashing yellow arrow operation. This study included six categories: 1. High accident intersections (for inclusion in Highway Safety Improvement Program (HSIP) funding); 2. Signal head modifications only; 3. Signal head replacement with median modifications; 4. Signal head and mast arm replacement; 5. Signal head, signal pole and mast arm replacement; and 6. Intersections where flashing yellow arrow operation is not recommended. Compliance with the Manual on Uniform Traffic Control Devices (MUTCD) played a large part in determining conversion costs because the standard for lateral position of the left-turn traffic signal greatly influenced the construction effort. Additionally, the left-turning vehicle’s sight distance factored into cost considerations. It’s important for agencies to utilize this study to understand all of the financial commitments and construction requirements for conversion to flashing yellow arrow operation, and ultimately to appreciate that the process is not purely a matter of swapping traffic signal heads.
ContributorsChambers, Susan Elizabeth (Author) / Kaloush, Kamil (Thesis advisor) / Mamlouk, Michael (Thesis advisor) / Hartig, Daniel (Committee member) / Lou, Yingyan (Committee member) / Arizona State University (Publisher)
Created2016
168450-Thumbnail Image.png
Description
As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a

As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a devastating impact on the construction industry specifically. This paper explores mainly the impact of the COVID-19 pandemic on construction projects in Saudi Arabia. Particularly, this paper explores how the pandemic and its related events contributed to the projects' schedule disturbances. This is because most of the projects rely on manpower and supply chains which were heavily disrupted due to the protective measures. For that, a study was conducted to evaluate the impact on the construction projects in Saudi Arabia, to what extent the schedule projects were affected, and what were the main reasons for the schedule delays. The research relied on a field survey and schedule analysis for 12 projects which resulted in identifying several causes of delays and the delayed durations that the projects in Saudi Arabia were facing. This research allows those in construction fields to identify the main causes of delays in order to avoid or minimize the impact of these issues on future projects.
ContributorsObeid, Muhammad Hasan Hani (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2021
154239-Thumbnail Image.png
Description
Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction

Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders. Alternative project delivery methods (APDM) such as Construction Manager at Risk (CMAR) have been introduced to increase stakeholder integration and ultimately enhance project performance. CMAR project performance impacts have been studied in the horizontal and vertical construction industries. However, the performance of CMAR projects in the pipeline engineering and construction industry has not been quantitatively studied.

The dissertation fills this gap in knowledge by performing the first quantitative analysis of CMAR performance on pipeline engineering and construction projects. This study’s two research objectives are:

(1) Develop a CMAR baseline of commonly measured project performance metrics

(2) Statistically compare the cost and schedule performance of CMAR to that of the traditional DBB delivery method

A thorough literature review led to the development of a data collection survey used in conjunction with structured interviews to gather qualitative and quantitative performance data from 66 completed water and wastewater pipeline projects. Performance data analysis was conducted to provide performance benchmarks for CMAR projects and to compare the performance of CMAR and DBB.

This study provides the first CMAR performance benchmark for pipeline engineering and construction projects. The results span across seven metrics in four performance areas (cost, schedule, project change, and communication). Pipeline projects delivered using CMAR have a median cost and schedule growth of -5% and 5.10%, respectively. These results are significantly improved from DBB baseline performance shown in other industries. To verify this, a statistical analysis was done to compare the cost and schedule performance of CMAR to similar DBB pipeline projects. The results show that CMAR pipeline projects are being delivered with 6.5% less cost growth and with 12.5% less schedule growth than similar DBB projects, providing owners with increased certainty when delivering their pipeline projects.
ContributorsFrancom, Tober C (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Thesis advisor) / Bearup, Wylie (Committee member) / Arizona State University (Publisher)
Created2015
130969-Thumbnail Image.png
Description
This Fantasyland expansion is a proposed 302,000 square foot development west of Harbor Boulevard and south of the Parade Route. This plot of land caught the eye of Performance Imagineering, the latest and greatest firm in theme park consulting, as it is currently home to Autopia, a massive drivable car

This Fantasyland expansion is a proposed 302,000 square foot development west of Harbor Boulevard and south of the Parade Route. This plot of land caught the eye of Performance Imagineering, the latest and greatest firm in theme park consulting, as it is currently home to Autopia, a massive drivable car ride for guests. Although this large portion of land is currently considered part of Tomorrowland, this proposition suggests otherwise. With the exponential growth of action and adventure themed attractions in the park, it comes time to revive the original Disney themes of love and fantasy. This proposal does so by introducing princesses from some of Disney's most successful intellectual property of late, to the Disneyland Resort.
ContributorsTaylor, Gary Joseph (Author) / Parrish, Kristen (Thesis director) / Ariaratnam, Samuel (Committee member) / Construction Engineering (Contributor) / Barrett, The Honors College (Contributor)
Created2020-12