Matching Items (16)
Filtering by

Clear all filters

152178-Thumbnail Image.png
Description
The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
ContributorsNihas, Syed (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2013
152185-Thumbnail Image.png
Description
Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e.

Over the past couple of decades, quality has been an area of increased focus. Multiple models and approaches have been proposed to measure the quality in the construction industry. This paper focuses on determining the quality of one of the types of roofing systems used in the construction industry, i.e. Sprayed Polyurethane Foam Roofs (SPF roofs). Thirty seven urethane coated SPF roofs that were installed in 2005 / 2006 were visually inspected to measure the percentage of blisters and repairs three times over a period of 4 year, 6 year and 7 year marks. A repairing criteria was established after a 6 year mark based on the data that were reported to contractors as vulnerable roofs. Furthermore, the relation between four possible contributing time of installation factors i.e. contractor, demographics, season, and difficulty (number of penetrations and size of the roof in square feet) that could affect the quality of the roof was determined. Demographics and difficulty did not affect the quality of the roofs whereas the contractor and the season when the roof was installed did affect the quality of the roofs.
ContributorsGajjar, Dhaval (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2013
150133-Thumbnail Image.png
Description
ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible

ABSTRACT Facility managers have an important job in today's competitive business world by caring for the backbone of the corporation's capital. Maintaining assets and the support efforts cause facility managers to fight an uphill battle to prove the worth of their organizations. This thesis will discuss the important and flexible use of measurement and leadership reports and the benefits of justifying the work required to maintain or upgrade a facility. The task is streamlined by invoking accountability to subject experts. The facility manager must trust in the ability of his or her work force to get the job done. However, with accountability comes increased risk. Even though accountability may not alleviate total control or cease reactionary actions, facility managers can develop key leadership based reports to reassign accountability and measure subject matter experts while simultaneously reducing reactionary actions leading to increased cost. Identifying and reassigning risk that are not controlled to subject matter experts is imperative for effective facility management leadership and allows facility managers to create an accurate and solid facility management plan, supports the organization's succession plan, and allows the organization to focus on key competencies.
ContributorsTellefsen, Thor (Author) / Sullivan, Kenneth (Thesis advisor) / Kashiwagi, Dean (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
149709-Thumbnail Image.png
Description
The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients have now been moving toward the best value environment (hire

The price based marketplace has dominated the construction industry. The majority of owners use price based practices of management (expectation and decision making, control, direction, and inspection.) The price based/management and control paradigm has not worked. Clients have now been moving toward the best value environment (hire contractors who know what they are doing, who preplan, and manage and minimize risk and deviation.) Owners are trying to move from client direction and control to hiring an expert and allowing them to do the quality control/risk management. The movement of environments changes the paradigm for the contractors from a reactive to a proactive, from a bureaucratic
on-accountable to an accountable position, from a relationship based
on-measuring to a measuring entity, and to a contractor who manages and minimizes the risk that they do not control. Years of price based practices have caused poor quality and low performance in the construction industry. This research identifies what is a best value contractor or vendor, what factors make up a best value vendor, and the methodology to transform a vendor to a best value vendor. It will use deductive logic, a case study to confirm the logic and the proposed methodology.
ContributorsPauli, Michele (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2011
Description
Facilities Management (FM) around the globe at different companies in different industries are often forced to make difficult decisions on whether or not to transition a workplace environment and how to decide what factors of a workplace environment can benefit or hinder a company's productivity. The data and research presented

Facilities Management (FM) around the globe at different companies in different industries are often forced to make difficult decisions on whether or not to transition a workplace environment and how to decide what factors of a workplace environment can benefit or hinder a company's productivity. The data and research presented within this paper are targeted at aiding and educating FM in determining what factors to consider in a workplace transition to an open-seating design and validate the importance of recognizing how these factors impact the productivity of the individual and the organization. Data contained in this paper was gathered through two different survey samples: 1) a semiconductor company that transitioned its employees from cubicles and offices to an open-seating environment; and 2) a general study open to professionals and their experiences and opinions on workplace environments. This data was used to validate or disprove the views on open-seating workspace held by the FM industry today. Data on the topic of how employees react to being transitioned to open-seating environments and looking at the breakdown of the results between engineers and non-engineers is examined within this research. Also covered within the research is data on transitions to other seating environments outside of open-seating concepts to evaluate and compare transition types. Lastly, data was gathered and discussed on the amount of time needed to adapt after a transition and what environment types were linked to being the most productive. This research provides insight on workplace environments and transitions and how they have an impact on productivity and can be used in the decision process when considering transitioning environments.
ContributorsThalin, William (Author) / Sullivan, Kenneth (Thesis advisor) / Smithwick, Jake (Committee member) / Stone, Brian (Committee member) / Arizona State University (Publisher)
Created2017
153848-Thumbnail Image.png
Description
ABSTRACT

The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties

ABSTRACT

The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties worldwide and in Saudi Arabia, as well as to give recommendation according to the outcomes of this research. The causes of litigious behavior in Saudi Arabia and other countries around the world were identified and documented, also the differences in litigation of the Saudi Arabian construction industry as compared to other countries were identified. Preliminary investigations revealed that there are some level of similarity in the nature of the causes. Thus, these causes were grouped into three main categories which are expectation factors, communications factors and documentation factors. Further research based on existing literature showed that the practices used to minimize litigation in the construction industry were investigated. The following delivery process were researched: design-build (DB) delivery method, Alliance Contracting, Construction Manager at Risk (CMAR), Best Value Approach, Integrated Project Delivery (IPD), and Public-Private Partnerships (PPPs), and the PIPS/PIRMS approach. These delivery methods were found to have issues, which means the methods by observation do not seem to be the ideal solution to minimize litigation in the construction industry. The only delivery method found to have no litigation issues was the PIPS/PIRMS approach.
ContributorsAlmutairi, Saud (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
153692-Thumbnail Image.png
Description
Energy performance and efficiency plays of major role in the operations of K-12 schools, as it is a significant expense and a source of budgetary pressure upon schools. Energy performance is tied to the physical infrastructure of schools, as well as the operational and behavioral patterns they accommodate. Little documentation

Energy performance and efficiency plays of major role in the operations of K-12 schools, as it is a significant expense and a source of budgetary pressure upon schools. Energy performance is tied to the physical infrastructure of schools, as well as the operational and behavioral patterns they accommodate. Little documentation exists within the existing literature on the measured post-occupancy performance of schools once they have begun measuring and tracking their energy performance. Further, little is known about the patterns of change over time in regard to energy performance and whether there is differentiation in these patterns between school districts.

This paper examines the annual Energy Use Intensity (EUI) of 28 different K-12 schools within the Phoenix Metropolitan Region of Arizona over the span of five years and presents an analysis of changes in energy performance resulting from the measurement of energy use in K-12 schools. This paper also analyzes the patterns of change in energy use over time and provides a comparison of these patterns by school district.

An analysis of the energy performance data for the selected schools revealed a significant positive impact on the ability for schools to improve their energy performance through ongoing performance measurement. However, while schools tend to be able to make energy improvements through the implementation of energy measurement and performance tracking, deviation may exist in their ability to maintain ongoing energy performance over time. The results suggest that implementation of ongoing measurement is likely to produce positive impacts on the energy performance of schools, however further research is recommended to enhance and refine these results.
ContributorsThurston, Anna (Author) / Sullivan, Kenneth (Thesis advisor) / Okamura, Patrick (Committee member) / Slife, Curtis (Committee member) / Arizona State University (Publisher)
Created2015
153833-Thumbnail Image.png
Description
Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure projects in the city of Makkah was found to be 39%. The most severe cause of delay was found to be the land acquisition factor. This highlights the critical land ownership and acquisition issues that is prevailing in Makkah. In addition to this, other factors include contractors’ lack of expertise, haphazard underground utilities (line services), and re-designing. It is concluded that majority of delays were caused from the owner’s side as compared to contractors, consultants, and other project’s stakeholders. This finding was in line with the research findings of the Gulf Countries Construction (GCC) Industry’s literature as well. This study will fill an important practice and research gap for improving the efficiency in project delivery for infrastructure projects in the holy city of Makkah and the Gulf countries at large.
ContributorsElawi, Ghazi Saad A (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
151441-Thumbnail Image.png
Description
ABSTRACT There has been plenty written on the topic of process management in business. This study focuses more on the need to research and develop a model to establish "balance" in process. Reengineering process and investing capital into current technology does not improve the outcome of process alone. The actual

ABSTRACT There has been plenty written on the topic of process management in business. This study focuses more on the need to research and develop a model to establish "balance" in process. Reengineering process and investing capital into current technology does not improve the outcome of process alone. The actual process activity coupled with human interface combined with technology determines the outcome of processes, however they do not indicate whether it is a balanced process or not. Wherein the word balance really means sustainable for long periods of time and easily reproduced by others. This study argues for the need of new research in the topic matter and its affects on company profitability, sustainability over long periods of time and tenure with employee.
ContributorsJeffers, Anthony (Author) / Sullivan, Kenneth (Thesis advisor) / Badger, Bill (Committee member) / Okamura, Patrick (Committee member) / Arizona State University (Publisher)
Created2012
149322-Thumbnail Image.png
Description
The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors

The U.S. Army Medical Command has been testing a leadership based structure to increase the performance of delivering construction and facility services in its system of $600M of construction and 26 major hospital facilities in the U.S. The organizational requirement was to minimize the management and oversight of contractors and simultaneously increase project performance. The research proposes that a leadership based structure can supplement the perception, preplanning, and risk minimization capability of a contractor's project manager, thus increasing the project performance (on time, within budget, and meeting expectations) and decreasing client management requirement. The projects were delivered in a best value and low price environment. The major impact of this research was that proactive management by contractors was more effective than traditional management such as direction, control, and inspection by client's professional representatives. The results based on data collection and date analyses validated that a leadership based structure can increase the performance of an organization and reduce its management requirement.
ContributorsMalhotra, Neha (Author) / Kashiwagi, Dean T. (Thesis advisor) / Sullivan, Kenneth (Committee member) / Badger, William (Committee member) / Arizona State University (Publisher)
Created2010