Matching Items (3)
Filtering by

Clear all filters

150719-Thumbnail Image.png
Description
This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure

This dissertation presents a portable methodology for holistic planning and optimization of right of way infrastructure rehabilitation that was designed to generate monetary savings when compared to planning that only considers single infrastructure components. Holistic right of way infrastructure planning requires simultaneous consideration of the three right of way infrastructure components that are typically owned and operated under the same municipal umbrella: roads, sewer, and water. The traditional paradigm for the planning of right way asset management involves operating in silos where there is little collaboration amongst different utility departments in the planning of maintenance, rehabilitation, and renewal projects. By collaborating across utilities during the planning phase, savings can be achieved when collocated rehabilitation projects from different right of way infrastructure components are synchronized to occur at the same time. These savings are in the form of shared overhead and mobilization costs, and roadway projects providing open space for subsurface utilities. Individual component models and a holistic model that utilize evolutionary algorithms to optimize five year maintenance, rehabilitation, and renewal plans for the road, sewer, and water components were created and compared. The models were designed to be portable so that they could be used with any infrastructure condition rating, deterioration modeling, and criticality assessment systems that might already be in place with a municipality. The models attempt to minimize the overall component score, which is a function of the criticality and condition of the segments within each network, by prescribing asset management activities to different segments within a component network while subject to a constraining budget. The individual models were designed to represent the traditional decision making paradigm and were compared to the holistic model. In testing at three different budget levels, the holistic model outperformed the individual models in the ability to generate five year plans that optimized prescribed maintenance, rehabilitation and renewal for various segments in order to achieve the goal of improving the component score. The methodology also achieved the goal of being portable, in that it is compatible with any condition rating, deterioration, and criticality system.
ContributorsCarey, Brad David (Author) / Lueke, Jason S (Thesis advisor) / Ariaratnam, Samuel (Committee member) / Bashford, Howard (Committee member) / Arizona State University (Publisher)
Created2012
151243-Thumbnail Image.png
Description
The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was

The construction industry faces important performance problems such as low productivity, poor quality of work, and work-related accidents and injuries. Creating a high reliability work system that is simultaneously highly productive and exceptionally safe has become a challenge for construction practitioners and scholars. The main goal of this dissertation was to create an understanding of high reliability construction work systems based on lessons from the production practices of high performance work crews. High performance work crews are defined as the work crews that constantly reach and maintain a high level of productivity and exceptional safety record while delivering high quality of work. This study was conceptualized on findings from High Reliability Organizations and with a primary focus on lean construction, human factors, safety, and error management. Toward the research objective, this dissertation answered two major questions. First, it explored the task factors and project attributes that shape and increase workers' task demands and consequently affect workers' safety, production, and quality performance. Second, it explored and investigated the production practices of construction field supervisors (foremen) to understand how successful supervisors regulate task and project demands to create a highly reliable work process. Employing case study methodology, this study explored and analyzed the work practices of six work crews and crew supervisors in different trades including concrete, masonry, and hot asphalt roofing construction. The case studies included one exceptional and one average performing crew from each trade. Four major factors were considered in the selection of exceptional crew supervisors: (1) safety performance, (2) production performance, (3) quality performance, and (4) the level of project difficulty they supervised. The data collection was carried out in three phases including: (1) interview with field supervisors to understand their production practices, (2) survey and interview with workers to understand their perception and to identify the major sources of task demands, and (3) several close field observations. Each trade's specific findings including task demands, project attributes, and production practices used by crew supervisors are presented in a separate chapter. At the end the production practices that converged to create high reliability work systems are summarized and presented in nine major categories.
ContributorsMemarian, Babak (Author) / Bashford, Howard (Thesis advisor) / Boren, Rebecca (Committee member) / Wiezel, Avi (Committee member) / Arizona State University (Publisher)
Created2012
154179-Thumbnail Image.png
Description
In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction

In today's era a lot of the construction projects suffer from time delay, cost overrun and quality defect. Incentive provisions are found to be a contracting strategy to address this potential problem. During last decade incentive mechanisms have gained importance, and they are starting to become adopted in the construction projects. Most of the previous research done in this area was purely qualitative, with a few quantitative studies. This study aims to quantify the performance of incentives in construction by collecting the data from more than 30 projects in United States through a questionnaire survey. First, literature review addresses the previous research work related to incentive types, incentives in construction industry, incentives in other industry and benefits of incentives. Second, the collected data is analyzed with statistical methods to test the significance of observed changes between two data sets i.e. incentive projects and non-incentive projects. Finally, the analysis results provide evidence for the significant impact of having incentives; reduced the cost and schedule growth in construction projects in United States.
ContributorsPaladugu, Bala Sai Krishna (Author) / El Asmar, Mounir (Thesis advisor) / Ernzen, James (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2015