Filtering by
- All Subjects: Primary Health Care
- Member of: Programs and Communities
The operation of Glen Canyon Dam on the Colorado River affects several downstream resources and water uses including water supply for consumptive uses in Arizona, California, and Nevada, hydroelectric power production, endangered species of native fish, recreational angling for non-native fish, and recreational boating in the Grand Canyon. Decisions about the magnitude and timing of water releases through the dam involve trade-offs between these resources and uses. The numerous laws affecting dam operations create a hierarchy of legal priorities that should govern these decisions. At the top of the hierarchy are mandatory requirements for water storage and delivery and for conservation of endangered species. Other resources and water uses have lower legal priorities. The Glen Canyon Dam Adaptive Management Program ("AMP") has substituted collaborative decision making among stakeholders for the hierarchy of priorities created by law. The AMP has thereby facilitated non-compliance with the Endangered Species Act by the Bureau of Reclamation, which operates the dam, and has effectively given hydroelectric power production and non-native fisheries higher priorities than they are legally entitled to. Adaptive management is consistent with the laws governing operation of Glen Canyon Dam, but collaborative decision making is not. Nor is collaborative decision making an essential, or even logical, component of adaptive management. As implemented in the case of Glen Canyon Dam, collaborative decision making has actually stifled adaptive management by making agreement among stakeholders a prerequisite to changes in the operation of the dam. This Article proposes a program for adaptive, but not collaborative, management of Glen Canyon Dam that would better conform to the law and would be more amenable to adaptation and experimentation than would the current, stakeholder-centered program.
This brief article, written for a symposium on "Collaboration and the Colorado River," evaluates the U.S. Department of the Interior's Glen Canyon Dam Adaptive Management Program ("AMP"). The AMP has been advanced as a pioneering collaborative and adaptive approach for both decreasing scientific uncertainty in support of regulatory decision-making and helping manage contentious resource disputes -- in this case, the increasingly thorny conflict over the Colorado River's finite natural resources. Though encouraging in some respects, the AMP serves as a valuable illustration of the flaws of existing regulatory processes purporting to incorporate collaboration and regulatory adaptation into the decision-making process. Born in the shadow of the law and improvised with too little thought as to its structure, the AMP demonstrates the need to attend to the design of the regulatory process and integrate mechanisms that compel systematic program evaluation and adaptation. As such, the AMP provides vital information on how future collaborative experiments might be modified to enhance their prospects of success.
With a focus on resources of the Colorado River ecosystem below Glen Canyon Dam, the Glen Canyon Dam Adaptive Management Program has included a variety of experimental policy tests, ranging from manipulation of water releases from the dam to removal of non-native fish within Grand Canyon National Park. None of these field-scale experiments has yet produced unambiguous results in terms of management prescriptions. But there has been adaptive learning, mostly from unanticipated or surprising resource responses relative to predictions from ecosystem modeling. Surprise learning opportunities may often be viewed with dismay by some stakeholders who might not be clear about the purpose of science and modeling in adaptive management. However, the experimental results from the Glen Canyon Dam program actually represent scientific successes in terms of revealing new opportunities for developing better river management policies. A new long-term experimental management planning process for Glen Canyon Dam operations, started in 2011 by the U.S. Department of the Interior, provides an opportunity to refocus management objectives, identify and evaluate key uncertainties about the influence of dam releases, and refine monitoring for learning over the next several decades. Adaptive learning since 1995 is critical input to this long-term planning effort. Embracing uncertainty and surprise outcomes revealed by monitoring and ecosystem modeling will likely continue the advancement of resource objectives below the dam, and may also promote efficient learning in other complex programs.
The Glen Canyon Dam Adaptive Management Program (AMP) has been identified as a model for natural resource management. We challenge that assertion, citing the lack of progress toward a long-term management plan for the dam, sustained extra-programmatic conflict, and a downriver ecology that is still in jeopardy, despite over ten years of meetings and an expensive research program. We have examined the primary and secondary sources available on the AMP’s design and operation in light of best practices identified in the literature on adaptive management and collaborative decision-making. We have identified six shortcomings: (1) an inadequate approach to identifying stakeholders; (2) a failure to provide clear goals and involve stakeholders in establishing the operating procedures that guide the collaborative process; (3) inappropriate use of professional neutrals and a failure to cultivate consensus; (4) a failure to establish and follow clear joint fact-finding procedures; (5) a failure to produce functional written agreements; and (6) a failure to manage the AMP adaptively and cultivate long-term problem-solving capacity.
Adaptive management can be an effective approach for addressing complex ecosystem-related processes like the operation of the Glen Canyon Dam, particularly in the face of substantial complexity, uncertainty, and political contentiousness. However, the Glen Canyon Dam AMP shows that a stated commitment to collaboration and adaptive management is insufficient. Effective management of natural resources can only be realized through careful attention to the collaborative design and implementation of appropriate problem-solving and adaptive-management procedures. It also requires the development of an appropriate organizational infrastructure that promotes stakeholder dialogue and agency learning. Though the experimental Glen Canyon Dam AMP is far from a success of collaborative adaptive management, the lessons from its shortcomings can foster more effective collaborative adaptive management in the future by Congress, federal agencies, and local and state authorities.
Background: Healthcare providers are encouraged to prepare their practice to effectively manage the care of mild to moderate adolescent depression. Cost-effective screening, diagnostic, and newly developed pediatric primary care depression management guidelines have been established. To integrate guidelines into practice, primary care providers (PCPs) must document effectively to ensure a complete treatment plan is in place in the patient’s electronic health record (EHR).
Intervention: Elements from a flowsheet were implemented into the EHR to promote thorough assessment and documentation of care delivered to adolescents with depression.
Methods: An initial chart review was completed on patients diagnosed with depression. An updated depression template was implemented within the EHR for six weeks. A follow-up chart review was completed post-intervention to determine if documentation of elements from the adolescent depression guidelines improved after the EHR update. Pre-intervention and post- intervention surveys were delivered to PCP’s to understand their perspective on adolescent depression management.
Outcomes: The chart review revealed that baseline PHQ-9 screenings were documented in 91% (n=43) of the charts reviewed in the pre-intervention timeframe. Only 78% (n=7) of the charts reviewed during post-intervention included PHQ-9 screenings. Early intervention treatment options documented in the pre-intervention timeframe included education 100% (n=47), medication prescriptions 53% (n=25), and psychotherapy referrals 18% (n=18). During post- intervention, education 100% (n=9), medication prescriptions 78% (7), and psychotherapy referrals 22% (n=7) were documented by the PCPs.
Recommendation: The quality improvement project focused heavily on documentation completed over a one year pre-intervention timeframe compared to a six-week post-intervention timeframe. Further evaluation and chart review over the next year will provide a more adequate comparison of documentation within primary care practice.
Methods: At an urban primary care pediatric office located in the southwestern US, an educational quality improvement project for healthcare practice providers and front office staff was conducted to increase the utilization of the existing EMR-linked patient portal. The healthcare providers were asked to complete a pre- and post- survey evaluation of their knowledge and usage of the patient portal. Provider and patient portal data usage was collected over a five-month period, September 2019 to January 2020.
Results: Data was analyzed using the Intellectus Statistics softwareTM. Significant results were found at the conclusion of the project in the number of active patient portal users, web-enabled, portal logins, labs published/viewed, messages sent, appointment reminders and Santovia utilization. At the end of the project no significance was found with messages received by the healthcare providers or staff through the patient portal. Survey results found significant differences between pre- and post- portal usage. No significance was found on providers’ knowledge on how to web-enable patients. Providers’ also demonstrated no significant change in their perceptions of the benefit in utilizing the portal in patient care after the educational intervention. Survey results allowed for additional analysis of commonly utilized portal functionalities, disease or health topics utilized in Santovia, and suggestions on how to make the use of the patient portal easier for providers.
Implications for Health Care Providers: This quality improvement project found that implementation an EMR-linked patient portal requires a comprehensive practice approach with structured education sessions. Including all employees can improve patient portal utilization. This educational project resulted in significant increases in most portal functionalities within 5 months. Further practice change evaluations are needed to evaluate how to improve patient portal utilization with a larger group of participants in a variety of outpatient settings.
Method: This project aimed to provide an evidence-based education for intake nurses to understand prevalence of PTSD and to use a screening tool Primary Care PTSD for DSM-5 (PC-PTSD-5) in a non-VA behavioral health facility.
Setting: The project site was a civilian behavioral health facility located in West Phoenix Metropolitan area. The behavioral health facility serves mental health and substance abuse needs. Project implementation focused on the intake department.
Measures: Sociodemographic data, PTSD diagnosis criteria, prevalence and PC-PTDSD-5 screening tool knowledge collected from pre and posttest evaluation. Patients’ charts for those admitted 6-week before and 6-week after the education to calculate numbers of screening tools completed by nurses at intake assessment.
Data analysis: Descriptive statistics was used to describe the sample and key measures; the Wilcoxon Signed Rank Test was used to examine differences between pre-test and post-test scores. Cohen’s effect size was used to estimate clinical significance.
Results: A total of 23 intake nurses (87.0% female, 65.2% 20-39 years old, 52.2% Caucasian, 95.6% reported having 0-10 years of experience, 56.5% completed Associate’s degree) received the education. For PTSD-related knowledge, the pre-test score (Mdn = 6.00) was significantly lower than the post-test score (Mdn = 10.00; Z= -4.23, p < .001), suggesting an increase of PTSD knowledge among nurses after the education. Regarding the diagnosis, the percentage of patients who were diagnosed with PTSD increased from (0.02% to 20% after the education).
Discussion: An evidence-based education aimed at enhancing intake nurses’ knowledge, confidence and skills implementing a brief and no-cost PTSD screening tool showed positive results, including an increase of PTSD diagnosis. The implementation of this screening tool in a civilian primary mental health care facility was feasible and helped patients connect to PTSD treatment in a timely fashion. Continued use of paper version of screening tool will be maintained at facility as an intermediary solution until final approval through parent company is received to implement into electronic medical records.
Disease burden is higher in the United States than in comparable countries. The Patient Self Determination Act of 1990 requires healthcare facilities to provide Advance Care Planning (ACP) information to all Medicare patients. The healthcare staffs’ (n=7) commitment to 3-days of ACP training increase ACP rates in the primary care setting. The Medicare Incentive Program is the platform for this initiative. This quantitative project used a valid and reliable pre and posttest design that consisted of 27 items on a Likert-scale. A 3.5-month chart audit (n=91) was conducted to assess the completion rate. Descriptive statistics was used to describe the demographic data.
The results of the two-tailed Wilcoxon signed rank test were significant based on an alpha value of 0.05, V = 0.00, z = -2.37, p = .018. There was a significant increase in the post-readiness to change average scores. A Mann Whitney test was used to analyze the statistically significant difference between the averages in two ACP types and electronic health record documentation (EHR). Staff did not always code (Mdn = 0.00) but they documented in the EHR (Mdn =1.00; 512.00, p = 0.003). ACP discussion was performed 63% of the time during Annual Wellness Visits (AWV), and there was a 49% increase in the EHR documentation. Trained staff are key stakeholders in guiding ACP conversations. They understand the barriers, impact, and consequences related to the lack of advance directives.