Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry

Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry landscape, the need to deliver projects within technical, budgetary, and schedule requirements becomes imperative to sustain a healthy return on investment for the project stakeholders. The fact that information lags within the capital projects industry has motivated this research to find practices and solutions that facilitate Instantaneous Project Controls (IPC).

The author hypothesized that there are specific practices that, if properly implemented, can lead to instantaneous controls of capital projects. It is also hypothesized that instantaneous project controls pose benefits to project performance. This research aims to find practices and identify benefits and barriers to achieving a real-time mode of control. To achieve these objectives, several lines of inquiry had to be pursued. A panel of 13 industry professionals and three academics collaborated on this research project. Two surveys were completed to map the current state of project control practices and to identify state-of-the-art or ideal processes. Ten case studies were conducted within and outside of the capital projects industry to identify practices for achieving real-time project controls. Also, statistical analyses were completed on retrospective data for completed capital projects in order to quantify the benefits of IPC. In conclusion, this research presents a framework for implementing IPC across the capital projects industry. The ultimate output from this research is procedures and recommendations that improve project controls processes.
ContributorsAbbaszadegan, Amin (Author) / Grau Torrent, David (Thesis advisor) / El Asmar, Mounir (Committee member) / Gibson, Jr., G. Edward (Committee member) / Arizona State University (Publisher)
Created2016
187709-Thumbnail Image.png
Description
During the rapid growth of infrastructure projects globally, countries pay high environmental and social costs as a result of the impacts caused from utilizing the traditional open-cut utility installation method that still widely being used in Egypt. For that, it was essential to have alternatives to reduce these environmental impacts

During the rapid growth of infrastructure projects globally, countries pay high environmental and social costs as a result of the impacts caused from utilizing the traditional open-cut utility installation method that still widely being used in Egypt. For that, it was essential to have alternatives to reduce these environmental impacts and social costs; however, there are some obstacles that prevent the implementation and the realization of these alternatives.This research is conducted mainly to evaluate the environmental impacts of open-cut excavation vs. trenchless technology in Egypt, through two main methodologies. Firstly, a field survey that aims to measure knowledge of people working in the Egyptian construction industry of trenchless technology, and the harms caused from keeping utilizing open-cut for installing all kinds of underground utilities. In addition to investigating the reasons behind not relying on trenchless technology as a safe alternative for open-cut in Egypt. Furthermore, in order to compare the greenhouse gases emissions resulted from both open-cut vs trenchless technology, a real case study is applied quantifying the amounts of the resulted greenhouse gases from each method. The results show that greenhouse gases emissions generated from open-cut were extremely higher than that of horizontal directional drilling as a trenchless installation method.
ContributorsKhedr, Ahmed Mossad Saeed Hafez (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2023
189341-Thumbnail Image.png
Description
The construction industry has struggled with a disappointing safety record, with workers often failing to identify hazards on construction sites. While virtual reality (VR) training has shown promise in improving hazard recognition skills, it is essential to address not only the ability to identify hazards but also the factors influencing

The construction industry has struggled with a disappointing safety record, with workers often failing to identify hazards on construction sites. While virtual reality (VR) training has shown promise in improving hazard recognition skills, it is essential to address not only the ability to identify hazards but also the factors influencing workers' decision to report them. Research has revealed that workers often fail to recognize hazards when they perceive them as low-risk, leading to unreported hazards and persistent safety risks. Anticipatory emotions play a crucial role in driving risk aversion, but construction novices lack the emotional experiences necessary for developing such anticipatory emotions. Consequently, they may engage in careless and risk-friendly behavior. To address this issue, hazard recognition training should incorporate immersive and emotionally arousing VR experiences. This dissertation focuses on the development of emotionally arousing and realistic construction-specific simulations to assess their impact on construction novices. The research explores the aspects of a simulation that facilitate emotional arousal and identifies features that enhance the sense of presence for construction practitioners within a virtual construction environment. Subsequently, the developed VR experience is tested on construction novices. The results indicate that the VR experience, based on the findings of this research, effectively elicits significant arousal in participants, as evidenced by galvanic skin response (GSR) data. Thematic analysis of participant feedback further supports the physiological data, with participants reporting a realistic and emotional experience that immersed them in hazardous conditions on a construction site. Ultimately, this research contributes by identifying the crucial aspects necessary for developing construction-specific VR experiences that elicit arousal from participants, ensuring an immersive and emotionally engaging hazard recognition training. By incorporating such training methods, the construction industry can improve workers' hazard identification and reporting behaviors, thereby enhancing overall safety in construction sites.
ContributorsPatil, Karan Ravindra (Author) / Ayer, Steven K. (Thesis advisor) / Hallowell, Matthew R. (Committee member) / El Asmar, Mounir (Committee member) / Bhandari, Siddharth (Committee member) / Arizona State University (Publisher)
Created2023
168450-Thumbnail Image.png
Description
As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a

As the construction industry in Saudi Arabia was on its way to thriving again. Their growth was due to the unprecedented volume of planned projects such as large-scale and unique projects. Suddenly, the world was faced with one of the most disrupting events in the last century which had a devastating impact on the construction industry specifically. This paper explores mainly the impact of the COVID-19 pandemic on construction projects in Saudi Arabia. Particularly, this paper explores how the pandemic and its related events contributed to the projects' schedule disturbances. This is because most of the projects rely on manpower and supply chains which were heavily disrupted due to the protective measures. For that, a study was conducted to evaluate the impact on the construction projects in Saudi Arabia, to what extent the schedule projects were affected, and what were the main reasons for the schedule delays. The research relied on a field survey and schedule analysis for 12 projects which resulted in identifying several causes of delays and the delayed durations that the projects in Saudi Arabia were facing. This research allows those in construction fields to identify the main causes of delays in order to avoid or minimize the impact of these issues on future projects.
ContributorsObeid, Muhammad Hasan Hani (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Committee member) / Chong, Oswald (Committee member) / Arizona State University (Publisher)
Created2021
171452-Thumbnail Image.png
Description
In a world where everything is drifting away from the intellectual into materialistic, and where everyone is rushing on the daily basis to provide their basic needs, everything is getting more expensive except the human life’s worth. Construction sites can be some of the clearer examples that show how the

In a world where everything is drifting away from the intellectual into materialistic, and where everyone is rushing on the daily basis to provide their basic needs, everything is getting more expensive except the human life’s worth. Construction sites can be some of the clearer examples that show how the technical work, the communication skills, team work and management relate to one another. However, lately, the safety of the labor is neither being prioritized nor considered an important aspect to even consider at sites. Lebanon is, unfortunately, one of the countries where most construction sites are aimed to increase production and decrease cost as much as possible, on behalf of labor safety measurements. The high occurrence of such cases are the result of the lack of government control and accountability, as well as other reasonings. Similar to the majority of countries, falls are the number one cause of fatalities and serious injuries on construction sites, especially building sites, where working on higher elevations is a must. This thesis focuses on the topic of “Techniques and technologies for reducing fall hazards in use on Lebanese building construction projects”. The main goal behind it is to shed light on whether there are any traditional, technical or modern mechanisms used for safety on the Lebanese construction sites, however statistically few they might be. On the other hand, Casting the deficiencies, weaknesses and flaws are also discussed by indicating some solutions and pointers on possible methods to improve. Hence, this thesis would demonstrate the high importance of this topic and consequently help construction managers and workers realize that safety should become a priority on all sites in the country. Researches done and interviews conducted show that fall hazards prevention/protection techniques are only implemented by large scale companies, and totally ignored by other companies which constitute the highest percentage of the active companies in the market now. Several causes are behind this and the result is one: More lives are put in danger due to lack of education, absence of audits and sanctions, and insufficient budgets
ContributorsMdawar, Hikmat (Author) / Gibson, George Edward (Thesis advisor) / El Asmar, Mounir (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2022
154239-Thumbnail Image.png
Description
Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction

Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders. Alternative project delivery methods (APDM) such as Construction Manager at Risk (CMAR) have been introduced to increase stakeholder integration and ultimately enhance project performance. CMAR project performance impacts have been studied in the horizontal and vertical construction industries. However, the performance of CMAR projects in the pipeline engineering and construction industry has not been quantitatively studied.

The dissertation fills this gap in knowledge by performing the first quantitative analysis of CMAR performance on pipeline engineering and construction projects. This study’s two research objectives are:

(1) Develop a CMAR baseline of commonly measured project performance metrics

(2) Statistically compare the cost and schedule performance of CMAR to that of the traditional DBB delivery method

A thorough literature review led to the development of a data collection survey used in conjunction with structured interviews to gather qualitative and quantitative performance data from 66 completed water and wastewater pipeline projects. Performance data analysis was conducted to provide performance benchmarks for CMAR projects and to compare the performance of CMAR and DBB.

This study provides the first CMAR performance benchmark for pipeline engineering and construction projects. The results span across seven metrics in four performance areas (cost, schedule, project change, and communication). Pipeline projects delivered using CMAR have a median cost and schedule growth of -5% and 5.10%, respectively. These results are significantly improved from DBB baseline performance shown in other industries. To verify this, a statistical analysis was done to compare the cost and schedule performance of CMAR to similar DBB pipeline projects. The results show that CMAR pipeline projects are being delivered with 6.5% less cost growth and with 12.5% less schedule growth than similar DBB projects, providing owners with increased certainty when delivering their pipeline projects.
ContributorsFrancom, Tober C (Author) / Ariaratnam, Samuel (Thesis advisor) / El Asmar, Mounir (Thesis advisor) / Bearup, Wylie (Committee member) / Arizona State University (Publisher)
Created2015
158623-Thumbnail Image.png
Description
This research focused on the structure-property relationships of a rejuvenator to understand the comprehensive rejuvenation mechanism of aged asphalt binder. Aged asphalt such as recycled asphalt shingles (RAS) and reclaimed asphalt pavement (RAP) contain various amounts of asphalt binder. However, the asphalt binder in RAS and RAP is severely aged

This research focused on the structure-property relationships of a rejuvenator to understand the comprehensive rejuvenation mechanism of aged asphalt binder. Aged asphalt such as recycled asphalt shingles (RAS) and reclaimed asphalt pavement (RAP) contain various amounts of asphalt binder. However, the asphalt binder in RAS and RAP is severely aged and inferior in properties compared to a virgin binder. To address this issue, liquid additives have been used under the general title of rejuvenators. That poses an additional challenge associated with the lack of clear metrics to differentiate between softeners and rejuvenators. Therefore, there is a need for a thorough study of rejuvenators. In this study, diverse-sourced rejuvenators have been used in RAS and RAP-modified binders as well as laboratory-prepared aged binders. The properties of the rejuvenated aged binder were characterized at a macro-level and molecular level. The study showed that the performance of the RAS-modified binder was significantly improved after bio-modification by a bio-rejuvenator.

This study further evaluated laboratory-prepared aged asphalt rejuvenated with different rejuvenators. The results found that oxidized bitumen became soft after adding rejuvenators, regardless of their source. Molecular dynamics simulation showed that the effective rejuvenator restored the molecular conformation and reduced the size of asphaltene nanoaggregates.

The study results showed that due to the specific chemical composition of certain rejuvenators, they may negatively impact the durability of the mixture, especially about its resistance to moisture damage and aging. Computational analysis showed that while the restoration capacity of rejuvenators is related to their penetration into and peptizing of asphaltene nanoaggregates, the durability of the restored aged asphalt is mainly related to the polarizability values of the rejuvenator. Rejuvenators with lower polarizability showed better resistance to aging and moisture damage.

In summary, this study develops the rheology-based indicators which relate to the molecular level phenomenon in the rejuvenation mechanism. The rheology-based indicators, for instance, crossover modulus and crossover frequency differentiated the rejuvenators from recycling agents. Moreover, the study found that rejuvenation efficiency and durability are depended on the chemistry of rejuvenators. Finally, based on the learning of chemistry, a chemically balanced rejuvenator is synthesized with superior rejuvenation properties.
ContributorsRajib, Amirul Islam (Author) / Fini, Elham (Thesis advisor) / Yin, Huiming (Committee member) / Kaloush, Kamil (Committee member) / Parast, Mahour (Committee member) / Mamlouk, Michael (Committee member) / El Asmar, Mounir (Committee member) / Arizona State University (Publisher)
Created2020
158853-Thumbnail Image.png
Description
The construction industry generates tremendous amounts of data every day. Data can inform practitioners to increase their project performance as well as the quality of the resulting built environment. The data gathered from each stage has unique characteristics, and processing them to the appropriate information is critical. However, it is

The construction industry generates tremendous amounts of data every day. Data can inform practitioners to increase their project performance as well as the quality of the resulting built environment. The data gathered from each stage has unique characteristics, and processing them to the appropriate information is critical. However, it is often difficult to measure the impact of the research across project phases (i.e., planning, design, construction, operation and maintenance, and end-of-life). The goal of this dissertation is to present how industry data can be used to make an impact on construction practices and test a suite of methods to measure the impact of construction research across project phases. The dissertation provides examples of impactful research studies for each project phase to demonstrate the collection and utilization of data generated from each stage and to assess the potential tangible impact on construction industry practices. The completed studies presented both quantitative and qualitative analyses. The first study focuses on the planning phase and provides a practice to improve frond end planning (FEP) implementation by developing the project definition rating index (PDRI) maturity and accuracy total rating system (MATRS). The second study uses earned value management system (EVMS) information from the design and construction phases to support reliable project control and management. The dissertation then provides a third study, this time focusing on the operations phase and comparing the impact of project delivery methods using the international roughness index (IRI). Lastly, the end-of-life or decommissioning phase is tackled through a study that gauges the monetary impact of the circular economy concept applied to reuse construction and demolition (C&D) waste. This dissertation measures the impact of the research according to the knowledge mobilization (KMb) theory, which illustrates the value of the work to the public and to practitioners.
ContributorsCho, Namho (Author) / El Asmar, Mounir (Thesis advisor) / Gibson, George (Committee member) / Kaloush, Kamil (Committee member) / Arizona State University (Publisher)
Created2020
158284-Thumbnail Image.png
Description
Water utilities across the United States are facing numerous challenges, such as limited funding and increasing project complexity, in constructing and upgrading their aging infrastructure. One innovative method to overcome these challenges is through the use of alternative project delivery methods (APDM), such as construction management at-risk (CMAR) and design-build

Water utilities across the United States are facing numerous challenges, such as limited funding and increasing project complexity, in constructing and upgrading their aging infrastructure. One innovative method to overcome these challenges is through the use of alternative project delivery methods (APDM), such as construction management at-risk (CMAR) and design-build (DB). Previous research has shown that APDM have the potential to deliver higher performing water infrastructure projects when compared to the traditional design-bid-build (DBB) method. However, there is a need to further examine APDM practices and develop tools that may support utilities in the delivery of their APDM water infrastructure projects. This study fills the knowledge gap by conducting several studies that may support public and private utilities in improving the delivery of their APDM water infrastructure projects. First, APDM implementation practices for water infrastructure projects are identified by assessing the state of practice, particularly during project procurement and execution. Second, DB project administration best practices are determined to support utilities seeking to add DB to their organization’s project delivery toolbox. Third, a pioneering web-based project delivery method decision-support tool was developed to aid utilities in selecting the appropriate delivery method for their water project. Finally, project-specific factors and attributes that impact project delivery performance are investigated through exploratory modeling and analysis. The study collected data on 75 completed treatment plant projects, conducted interviews with ten utilities that successfully deliver their water projects using DB, and worked closely with several industry experts through industry workshops and panels. Key findings related to water infrastructure project delivery revealed in this study included: (1) guaranteed maximum price (GMP) is the preferred compensation type for APDM projects; (2) utilities statistically having the lowest comfort level with delivering CMAR projects; (3) qualifications-based procurement is an effective DB project delivery practice; (4) the identification of 13 key project delivery method selection factors; and (5) the three highest predictors that impact unit cost performance are project complexity, project team chemistry and communication, and project size.
ContributorsFeghaly, Jeffrey (Author) / El Asmar, Mounir (Thesis advisor) / Ariaratnam, Samuel (Thesis advisor) / Bearup, Wylie (Committee member) / Arizona State University (Publisher)
Created2020
153880-Thumbnail Image.png
Description
Project teams expend substantial effort to develop scope definition during the front end planning phase of large, complex projects, but oftentimes neglect to sufficiently plan for small projects. An industry survey administered by the author showed that small projects make up 70-90 percent (by count) of all projects in the

Project teams expend substantial effort to develop scope definition during the front end planning phase of large, complex projects, but oftentimes neglect to sufficiently plan for small projects. An industry survey administered by the author showed that small projects make up 70-90 percent (by count) of all projects in the industrial construction sector, the planning of these project varies greatly, and that a consistent definition of “small industrial project” did not exist. This dissertation summarizes the motivations and efforts to develop a non-proprietary front end planning tool specifically for small industrial projects, namely the Project Definition Rating Index (PDRI) for Small Industrial Projects. The author was a member of Construction Industry Institute (CII) Research Team 314, who was tasked with developing the tool in May of 2013. The author, together with the research team, reviewed, scrutinized and adapted an existing industrial-focused FEP tool, the PDRI for Industrial Projects, and other resources to develop a set of 41 specific elements relevant to the planning of small industrial projects. The author supported the facilitation of five separate industry workshops where 65 industry professionals evaluated the element descriptions, and provided element prioritization data that was statistically analyzed and used to develop a weighted score sheet that corresponds to the element descriptions. The tool was tested on 54 completed and in-progress projects, the author’s analysis of which showed that small industrial projects with greater scope definition (based on the tool’s scoring scheme) outperformed projects with lesser scope definition regarding cost performance, schedule performance, change performance, financial performance, and customer satisfaction. Moreover, the author found that users of the tool on in-progress projects overwhelmingly agreed that the tool added value to their projects in a timeframe and manner consistent with their needs, and that they would continue using the tool in the future. The author also developed an index-based selection guide to aid PDRI users in choosing the appropriate tool for use on an industrial project based on distinguishing project size with indicators of project complexity. The final results of the author’s research provide several contributions to the front end planning, small projects, and project complexity bodies of knowledge.
ContributorsCollins, Wesley A (Author) / Parrish, Kristen (Thesis advisor) / Gibson, Jr., G. Edward (Committee member) / El Asmar, Mounir (Committee member) / Arizona State University (Publisher)
Created2015