Matching Items (9)
Filtering by

Clear all filters

152178-Thumbnail Image.png
Description
The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past

The construction industry in India suffers from major time and cost overruns. Data from government and industry reports suggest that projects suffer from 20 to 25 percent time and cost overruns. Waste of resources has been identified as a major source of inefficiency. Despite a substantial increase in the past few years, demand for professionals and contractors still exceeds supply by a large margin. The traditional methods adopted in the Indian construction industry may not suffice the needs of this dynamic environment, as they have produced large inefficiencies. Innovative ways of procurement and project management can satisfy the needs aspired to as well as bring added value. The problems faced by the Indian construction industry are very similar to those faced by other developing countries. The objective of this paper is to discuss and analyze the economic concerns, inefficiencies and investigate a model that both explains the Indian construction industry structure and provides a framework to improve efficiencies. The Best Value (BV) model is examined as an approach to be adopted in lieu of the traditional approach. This could result in efficient construction projects by minimizing cost overruns and delays, which until now have been a rarity.
ContributorsNihas, Syed (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2013
157200-Thumbnail Image.png
Description

The built environment is responsible for a significant portion of global waste generation.

Construction and demolition (C&D) waste requires significant landfill areas and costs

billions of dollars. New business models that reduce this waste may prove to be financially

beneficial and generally more sustainable. One such model is referred to as the “Circular

Economy”

The built environment is responsible for a significant portion of global waste generation.

Construction and demolition (C&D) waste requires significant landfill areas and costs

billions of dollars. New business models that reduce this waste may prove to be financially

beneficial and generally more sustainable. One such model is referred to as the “Circular

Economy” (CE), which promotes the efficient use of materials to minimize waste

generation and raw material consumption. CE is achieved by maximizing the life of

materials and components and by reclaiming the typically wasted value at the end of their

life. This thesis identifies the potential opportunities for using CE in the built environment.

It first calculates the magnitude of C&D waste and its main streams, highlights the top

C&D materials based on weight and value using data from various regions, identifies the

top C&D materials’ current recycling and reuse rates, and finally estimates a potential

financial benefit of $3.7 billion from redirecting C&D waste using the CE concept in the

United States.

ContributorsAldaaja, Mohammad (Author) / El Asmar, Mounir (Thesis advisor) / Buch, Rajesh (Committee member) / Kaloush, Kamil (Committee member) / Arizona State University (Publisher)
Created2019
134315-Thumbnail Image.png
Description
Sustainable Materials Management and Circular Economy are both frameworks for considering the way we interact with the world's resources. Different organizations and institutions across the world have adopted one philosophy or the other. To some, there seems to be little overlap of the two, and to others, they are perceived

Sustainable Materials Management and Circular Economy are both frameworks for considering the way we interact with the world's resources. Different organizations and institutions across the world have adopted one philosophy or the other. To some, there seems to be little overlap of the two, and to others, they are perceived as being interchangeable. This paper evaluates Sustainable Materials Management (SMM) and Circular Economy (CE) individually and in comparison to see how truly different these frameworks are from one another. This comparison is then extended into a theoretical walk-through of an SMM treatment of concrete pavement in contrast with a CE treatment. With concrete being a ubiquitous in the world's buildings and roads, as well as being a major constituent of Construction & Demolition waste generated, its analysis is applicable to a significant portion of the world's material flow. The ultimate test of differentiation between SMM and CE would ask: 1) If SMM principles guided action, would the outcomes be aligned with or at odds with CE principles? and conversely 2) If CE principles guided action, would the outcomes be aligned with or at odds with SMM principles? Using concrete pavement as an example, this paper seeks to determine whether or not Sustainable Materials Management and Circular Economy are simply different roads leading to the same destination.
ContributorsAbdul-Quadir, Anisa (Author) / Kelman, Candice (Thesis director) / Buch, Rajesh (Committee member) / Barrett, The Honors College (Contributor)
Created2017-05
153848-Thumbnail Image.png
Description
ABSTRACT

The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties

ABSTRACT

The problem of litigation and disputes in the construction sector is a major impediment to countries’ development goals. The purpose of this paper is to investigate the problem of high legal costs and long delays that arise due to litigation involving project owners, designers, contractors and other construction parties worldwide and in Saudi Arabia, as well as to give recommendation according to the outcomes of this research. The causes of litigious behavior in Saudi Arabia and other countries around the world were identified and documented, also the differences in litigation of the Saudi Arabian construction industry as compared to other countries were identified. Preliminary investigations revealed that there are some level of similarity in the nature of the causes. Thus, these causes were grouped into three main categories which are expectation factors, communications factors and documentation factors. Further research based on existing literature showed that the practices used to minimize litigation in the construction industry were investigated. The following delivery process were researched: design-build (DB) delivery method, Alliance Contracting, Construction Manager at Risk (CMAR), Best Value Approach, Integrated Project Delivery (IPD), and Public-Private Partnerships (PPPs), and the PIPS/PIRMS approach. These delivery methods were found to have issues, which means the methods by observation do not seem to be the ideal solution to minimize litigation in the construction industry. The only delivery method found to have no litigation issues was the PIPS/PIRMS approach.
ContributorsAlmutairi, Saud (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
153833-Thumbnail Image.png
Description
Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other

Delays are a major cause for concern in the construction industry both globally and locally in Saudi Arabia. This paper identifies the main causes of delay in infrastructure projects in the holy city of Makkah (Saudi Arabia) and compares these with projects around the rest of the country and other Gulf countries as well. Data were obtained from 49 infrastructure projects that were undertaken by the owner and were analyzed quantitatively to understand the severity and causes of delay. 10 risk factors were identified in this study and these factors were grouped into four categories. The average delay in infrastructure projects in the city of Makkah was found to be 39%. The most severe cause of delay was found to be the land acquisition factor. This highlights the critical land ownership and acquisition issues that is prevailing in Makkah. In addition to this, other factors include contractors’ lack of expertise, haphazard underground utilities (line services), and re-designing. It is concluded that majority of delays were caused from the owner’s side as compared to contractors, consultants, and other project’s stakeholders. This finding was in line with the research findings of the Gulf Countries Construction (GCC) Industry’s literature as well. This study will fill an important practice and research gap for improving the efficiency in project delivery for infrastructure projects in the holy city of Makkah and the Gulf countries at large.
ContributorsElawi, Ghazi Saad A (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
153835-Thumbnail Image.png
Description
Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects

Saudi Arabia has been having many issues with large construction projects such as delays, low performance and high cost. Some studies show that around 70% of the public projects in Saudi Arabia are delayed. These issues have resulted from many factors. One of the factors believed to be delaying projects is the Saudi procurement system. The Saudi procurement system only selects contracts based on the lowest bid price offered. However, the Saudi procurement system has been found to not only produce delayed low quality projects, but also has resulted in higher costs.

This paper shows how to modify the Saudi procurement system by implementing a clarification phase, which is the most important phase in the Performance Information Procurement System (PIPS). The clarification phase requires the bid’s winning contractor to submit a project scope, a project schedule, to identify risks that not their responsibility, performance measurements and a milestone schedule. The PIPS system has been one of the most successful systems around the world and has shown a 98% success rate in six different countries with risks and cost reductions up to 30%.

This research conducted a survey of 157 engineers, 33 consultants, 9 owners, 5 vendors, 13 academics, and 28 architects to develop the public procurement system in Saudi Arabia. The participants work in government sectors with an interest in the Saudi Arabian procurement system. 80.61 % of participants believe that the traditional Saudi procurement system consistently selects poor performing contractors. Moreover, 95.97% of participants think that the selection of contractors based only on the lowest price criterion affects projects negatively. Also, 96.20% of participants in the survey feel that there needs to be a change in the traditional Saudi Arabian procurement system. 88.7% of participants agree to require the contractor to identify risks, and 96.03 % of participants agree that the contractors must have a plan. Moreover, 95.45% of participants agree to require a contractor review the scope of a project and verify that it is correct. Finally, 82.18% of participants agree to require a contractor to resolve all owner concerns before signing a contract to improve construction projects performance. The paper shows the need to change the Saudi procurement system and a solution to this growing problem.
ContributorsAlofi, Ahmed Abdulrahman (Author) / Kashiwagi, Dean (Thesis advisor) / Sullivan, Kenneth (Committee member) / Kashiwagi, Jacob (Committee member) / Arizona State University (Publisher)
Created2015
154579-Thumbnail Image.png
Description
Entering a new market in the construction industry is a complex task. Although many contractors have experienced the benefits of expanding their market offerings, many more have had unsuccessful experiences causing hardship for the entire organization. Standardized decision-making processes can help to increase the likelihood of success, but

Entering a new market in the construction industry is a complex task. Although many contractors have experienced the benefits of expanding their market offerings, many more have had unsuccessful experiences causing hardship for the entire organization. Standardized decision-making processes can help to increase the likelihood of success, but few specialty contractors have taken the time to develop a formal procedure. According to this research, only 6 percent of survey respondents and 7 percent of case study participants from the sheet metal industry have a formal decision process. Five sources of data (existing literature, industry survey, semi-structured interviews, factor prioritization workshops, and expert panel discussions) are consulted to understand the current market entry decision-making practices and needs of the sheet metal industry. The data help to accomplish three study objectives: (1) determine the current processes and best practices used for market entry decision-making in the sheet metal industry, (2) identify motivations leading to market entry by sheet metal contractors, and (3) develop a standardized decision process that improves market entry decision outcomes. Grounded in a firm understanding of industry practices, a three-phased decision-making framework is created to provide a structured approach to guide contractors to an informed decision. Four industry leaders with over 175 years of experience in construction reviewed and applied every step of the framework to ensure it is practical and easy to use for contractors.
ContributorsSullivan, Jera J (Author) / El Asmar, Mounir (Thesis advisor) / Gibson, G Edward (Committee member) / Sullivan, Kenneth (Committee member) / Arizona State University (Publisher)
Created2016
154610-Thumbnail Image.png
Description
Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry

Despite advancements in construction and construction-related technology, capital project performance deviations, typically overruns, remain endemic within the capital projects industry. Currently, management is generally unaware of the current status of their projects, and thus monitoring and control of projects are not achieved effectively. In an ever-increasing competitive industry landscape, the need to deliver projects within technical, budgetary, and schedule requirements becomes imperative to sustain a healthy return on investment for the project stakeholders. The fact that information lags within the capital projects industry has motivated this research to find practices and solutions that facilitate Instantaneous Project Controls (IPC).

The author hypothesized that there are specific practices that, if properly implemented, can lead to instantaneous controls of capital projects. It is also hypothesized that instantaneous project controls pose benefits to project performance. This research aims to find practices and identify benefits and barriers to achieving a real-time mode of control. To achieve these objectives, several lines of inquiry had to be pursued. A panel of 13 industry professionals and three academics collaborated on this research project. Two surveys were completed to map the current state of project control practices and to identify state-of-the-art or ideal processes. Ten case studies were conducted within and outside of the capital projects industry to identify practices for achieving real-time project controls. Also, statistical analyses were completed on retrospective data for completed capital projects in order to quantify the benefits of IPC. In conclusion, this research presents a framework for implementing IPC across the capital projects industry. The ultimate output from this research is procedures and recommendations that improve project controls processes.
ContributorsAbbaszadegan, Amin (Author) / Grau Torrent, David (Thesis advisor) / El Asmar, Mounir (Committee member) / Gibson, Jr., G. Edward (Committee member) / Arizona State University (Publisher)
Created2016
155168-Thumbnail Image.png
Description
Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and

Saudi Arabia has been facing issues with completing construction projects on time and on budget. It has been documented that 70% of public construction projects are delayed. Studies have identified the low-bid delivery method as an important factor in causing such delays. The procurement system (low-bid) ignores contractors’ performance, and that is reflected in projects’ performance. A case study was performed, at a University campus in northern Saudi Arabia, identifying the major causes of project delays and cost overruns. The University was experiencing delays from 50% to 150%. Also, the actual project costs for four projects were examined and found that all four projects’ costs were higher than the original bid. The delay and cost overruns factors were gathered from the University engineers. A literature research identified one construction management method, best value performance information procurement system (BV PIPS), has documented multiple times its ability to improve project performance. In a comparison using the result of a case study and the results of (BV PIPS), Saudi Arabia’s delivery system was identified as a potential cause of project performance issues. The current procurement system was analyzed and modified to adapt with the (BV PIPS). The proposed procurement system using BV PIPS, which can be implemented in Saudi Arabia, was created with owner side. A large survey was conducted of 761 classified contractors and 43 universities’ representatives who rated causes of delay factors and cost overruns. The delay factors were then compared to delay factors experienced on Saudi construction projects, identified by performing a literature research. The comparison identified 14 important causes of delays. Moreover, the survey showed that classified contractors and universities’ representatives unsatisfied with low-bid, and they agreed with BV PIPS which selecting vendors based on performance with price. The proposed model required a submitted level of experience (LE), risk assessment (RA), and value added (VA). Besides, project managers of vendors should be interviewed during the clarification phase. In addition, venders should submit the project’s scope, technical schedule, milestone schedule, and risk management plan. In the execution phase, vendors should submit a weekly risk report (WRR) and director’s report (DR).
ContributorsAlzara, Majed (Author) / Kashiwagi, Dean (Thesis advisor) / Kashiwagi, Jacob (Committee member) / Al-Tassan, Abdulrahman (Committee member) / Arizona State University (Publisher)
Created2016