Description

Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace

Much of the water and wastewater lines in the United States are nearing the end of their useful life. A significant reinvestment is needed in the upcoming decades to replace or rehabilitate the water and wastewater infrastructure. Currently, the traditional method for delivering water and wastewater pipeline engineering and construction projects is design-bid-build (DBB). The traditional DBB delivery system is a sequential low-integration process and can lead to inefficiencies and adverse relationships between stakeholders.

Reuse Permissions
  • 4.7 MB application/pdf

    Download count: 0

    Details

    Contributors
    Date Created
    • 2015
    Resource Type
  • Text
  • Collections this item is in
    Note
    • Partial requirement for: Ph.D., Arizona State University, 2015
      Note type
      thesis
    • Includes bibliographical references (pages 112-126)
      Note type
      bibliography
    • Field of study: Civil engineering

    Citation and reuse

    Statement of Responsibility

    by Tober C. Francom

    Machine-readable links