Description

This article assesses the combined influence of information integration and automated data analytics on project performance. To this end, retrospective data on 78 completed projects, with a total installed value

This article assesses the combined influence of information integration and automated data analytics on project performance. To this end, retrospective data on 78 completed projects, with a total installed value of $8 billion, was collected. The data collection effort characterized, for each project, the level of internal and external information integration. Information integration was assessed as the seamlessly interoperable sharing of data produced from a work function with other functions/stakeholders so that no manual data transfer was required.

Reuse Permissions
  • application/pdf

    Download count: 0

    Details

    Contributors
    Date Created
    • 2015-10-27
    Resource Type
  • Text
  • Collections this item is in
    Identifier

    Citation and reuse

    Cite this item

    This is a suggested citation. Consult the appropriate style guide for specific citation guidelines.

    Abbaszadegan, A., & Grau, D. (2015). Assessing the Influence of Automated Data Analytics on Cost and Schedule Performance. Procedia Engineering, 123, 3-6. doi:10.1016/j.proeng.2015.10.047

    Machine-readable links