Description

The objective of this work is to perform LCAs three wastewater treatement alternatives at battalion-sized (500 soldier) FOBs.

Downloads
pdf (2.5 MB)

Download count: 0

Details

Date Created
2014-06-13
Resource Type
  • Text
  • Collaborating institutions
    School of Sustainable Engineering and the Built Environment (SSEBE) / Center for Earth Systems Engineering and Management
    Identifier
    • Identifier Value
      ASU-SSEBE-CESEM-2014-CPR-008

    Machine-readable links